SW SEWER PROJECT

September 1st, 2021 Apollo has completed the gravity sewer pipe installation (ex: Owens Rd, Mojonnier Rd, Farm Fields, College Avenue). The College Avenue sewer pipe is installed up to Lift Station No. 6. Remaining work here is the connection to this lift station and the demolition that needs to occur. A map of project component is located here

College Avenue has been paved and striped from the south end of the project up to the north most entrance of the schools, this is just south of the start of the stormwater improvements. Traffic is currently being routed in/out of the schools south via US 125.  College Avenue will likely remained closed to through traffic between SE Lamperti/SE Mojonnier and SE Cedar Bend Drive as the CIty has to do some stormwater outfall work at the Stone Creek Crossing per State Dept of Ecology order. The construction press release and map is located here. 

Apollo has started procuring material for the stormwater improvements, the pipe and manholes/catch basins are generally readily available and installation could begin within a few weeks. The treatment filters have a 4-8 week lead time. However, they will be installed outside of the paved roadway and can be installed once they arrive. 

The main focus over the next month is planned to be on the installation of the lift station pumps, piping/valving, installation of the pressurized sewer pipe up SW Teal Ln to connect to the gravity sewer in Mojonnier Rd, and construction of the electrical building. The plan would be to install the stormwater pipe and structures in College Avenue simultaneously once they arrive as well. 

Mid August 2021 Update



Late April 2021 Update


March 2021 Update



SW Sewer Map

Contacts
Public Works Director Mr. Robert McAndrews
Em: rmcandrews@cpwa.us
Ph: (509)-394-8526

Press Release - S College Ave Temporary Closure (7-13-2021)
Press Release - SW Mojonnier Rd Temporary Closure (5-10-2021)

The Southwest Wastewater Trunk Line will provide needed wastewater system capacity for South College Place going from the Commercial Drive area, through Meadowbrook, Harvest Meadows, and the recently annexed property across from College Place High School. Wastewater will be conveyed west to the City's Wastewater Treatment Plant. A new lift station will be constructed on city-owned property on Teal Rd to replace a temporary, outdated, at capacity lift station at the southeast corner of College Avenue and Lamperti Street. J-U-B Engineering with the assistance of PBS is completing final engineering plans for the project. This project has appeared in the city's six-year Capital Facility Plan since 2018. This project is out to bid in December 2020. Construction will take place throughout Fiscal Year 2021. It is being financed through a combination of USDA-Rural Development Grant and Loan Dollars, State Department of Ecology Grant/Loan Dollars, Port .09 Grant, and Wastewater Utility Funds. The estimated cost of the project is around $7.5 million dollars. 

Legislative Gateway
Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Search for file type:
Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category
Please click on one of the categories below to see uploaded documents.
Legal Documents 6 documents
CAT:552
Download File
This document governs the relationship between the City and property owners surrounding the engineering phase of the project.
document seq 0.00
file:556
Download File
This is the Memorandum of Understanding between the City and property owners pertaining to construction phase of the SW Sewer project.
document seq 0.00
file:557
Download File
Acquisition of five acres for wastewater lift station on SW Teal Rd.
document seq 0.00
file:558
Download File
This document governs the permanent easement for the Southwest Wastewater Trunk Line.
document seq 0.00
file:559
Download File
This document dedicates easement for the Southwest Wastewater Trunk Line from the Christianson's
document seq 0.00
file:560
Download File
Appraisal for Five Acres Needed for Lift Station
document seq 0.00
file:567
Grant Documents 6 documents
CAT:553
Download File
Document detailing financing for the Southwest Wastewater Trunk Line
document seq 0.00
file:568
Download File
Signed form to begin work to accept grant/loan
document seq 0.00
file:569
Download File
USDA-RD Grant Document
document seq 0.00
file:570
Download File
Intent to File USDA-RD Grant Resolution
document seq 0.00
file:571
Download File
Grant Agreement for SW Sewer
document seq 0.00
file:573
Download File
document seq 0.00
file:620
Engineering 4 documents
CAT:554
Download File
This document is the Southwest Sewer Facility Plan Addendum to the City's Wastewater System Plan
document seq 0.00
file:561
Download File
This is the SEPA document for the Southwest Wastewater Trunk Line
document seq 0.00
file:562
Download File
Updated engineering alignment through College Avenue.
document seq 0.00
file:564
Download File
Cultural resources report for Southwest Wastewater Trunk Line Project
document seq 0.00
file:565
Construction 2 documents
CAT:555
Download File
Construction Contract with Apollo Inc.
document seq 0.00
file:613
Download File
Draft Construction Schedule put together by J-U-B Engineers and Apollo Inc as of February 26th, 2021
document seq 0.00
file:621